Kestrel Line Plumbing & Mechanical

Quality and safety

Quality control

Every federal job gets a written Quality Control Plan and a dedicated QC manager independent of production. We use the three-phase control system (preparatory, initial and follow-up inspections), daily QC reports, a deficiency log closed out before each pay application, and pressure-test and flushing records for every system. Steam trap work adds photo and test records for every trap.

Safety

Written safety program aligned with EM 385-1-1, with steam-specific procedures for burns and scalds, lockout/tagout, confined space and hot work. EMR 0.78. Zero lost-time incidents in 2023 and 2024. All field supervisors hold OSHA 30.

Certifications and licenses

CertificationSinceExpires
SBA VetCert Service-Disabled Veteran-Owned Small BusinessMarch 2024March 2027
Texas Historically Underutilized Business (HUB)20192027
ASSE 6010 Medical Gas Installers (9 staff)variousvarious, tracked in ServiceTitan
State-certified backflow testers (21 staff)variousrenewed annually
ISO 9001 quality managementWorking toward certification; not certified yet